2000-ton Butane Spherical Gas Storage Tank Construction Project at PENI Depot in Burkina Faso The project is undertaken by Joint Venture CGCINT-JIEC, whose main works include construction of a 2000-ton butane spherical gas storage tank at PENI depot of Burkina Faso National Hydrocarbons Company (SONABHY), including the supply and installation of a 4018 m³ spherical tank, as well as associated civil works, gas pipelines, fire pipelines, and electrical engineering construction.
PENI Liquid Hydrocarbons Storage Tank Construction Project in Burkina Faso The project is undertaken by Joint Venture CGCINT-HIEICO and is located at Peni liquid hydrocarbon depot of Burkina Faso National Hydrocarbons Company (SONABHY). The project mainly involves the construction of 9 liquid hydrocarbons storage tanks, five of which have a capacity of 20,000 m³ and four of which have a capacity of 1,000 m³ respectively, as well as other ancillary works such as pipelines and EIA (electricity, instrumentation and automatic control system).
Project of Missan Oil Fields Water Treatment Plant - Phase II in Iraq The capacity of the plant is 10,000 m3/d. The main works include all civil works, installation, commissioning and auxiliary works for trial operation. Civil works mainly contain equipment foundation, steel structure, site formation works, etc. Installation works mainly contain equipment and pipeline’s installation, pressure test, electrical instruments installation and auxiliary works for trial operation, etc.Treatment equipmentCoalescing oil eliminator and parallel plate skimmer vesselFilter skid liftingLifting of oil eliminatorThermal insulation work of oil eliminator
Civil Works of BUT Upgrade and New CPF in Missan Oil Fields, Iraq This project will double its crude oil processing capacity from current 150,000 barrels to 300,000 barrels per day. It mainly includes twelve units of BUT upgrade, new CPF and BUS1 renovation, etc., which are distributed in five single buildings with a total area of about 10,000 m2, as well as equipment foundations, roads and site formation works, etc.NEW CCR constructionNEW CCR buildingPower distribution roomConstruction of fire water tankSteel binding of roof slab of LCR01 building
Civil Work Construction Project of Missan Oil Fields Natural Gas Treatment Plant in Iraq The project design treatment capacity is 2,000,000 m3/d. It mainly includes six units of pressurization, desulfurization, sulfur recovery, heating, circulating water station and public control units, which are distributed in three single buildings with a total area of about 3,600 m2, as well as equipment foundations, cable trenches, roads and site formation works, etc.Compressor foundation construction of booster unitPrecast pile constructionHeating unit, nitrogen generation unit, booster unit, sulfur unitFCR12 and power distribution roomFAR13 Building