2000-ton Butane Spherical Gas Storage Tank Construction Project at PENI Depot in Burkina Faso

The project is undertaken by Joint Venture CGCINT-JIEC, whose main works include construction of a 2000-ton butane spherical gas storage tank at PENI depot of Burkina Faso National Hydrocarbons Company (SONABHY), including the supply and installation of a 4018 m³ spherical tank, as well as associated civil works, gas pipelines, fire pipelines, and electrical engineering construction.



PENI Liquid Hydrocarbons Storage Tank Construction Project in Burkina Faso

The project is undertaken by Joint Venture CGCINT-HIEICO and is located at Peni liquid hydrocarbon depot of Burkina Faso National Hydrocarbons Company (SONABHY). The project mainly involves the construction of 9 liquid hydrocarbons storage tanks, five of which have a capacity of 20,000 m³ and four of which have a capacity of 1,000 m³ respectively, as well as other ancillary works such as pipelines and EIA (electricity, instrumentation and automatic control system).







Project of Missan Oil Fields Water Treatment Plant - Phase II in Iraq

The capacity of the plant is 10,000 m3/d. The main works include all civil works, installation, commissioning and auxiliary works for trial operation. Civil works mainly contain equipment foundation, steel structure, site formation works, etc. Installation works mainly contain equipment and pipeline’s installation, pressure test, electrical instruments installation and auxiliary works for trial operation, etc.

Treatment equipment

Coalescing oil eliminator and parallel plate skimmer vessel

Filter skid lifting

Lifting of oil eliminator

Thermal insulation work of oil eliminator

Civil Works of BUT Upgrade and New CPF in Missan Oil Fields, Iraq

This project will double its crude oil processing capacity from current 150,000 barrels to 300,000 barrels per day. It mainly includes twelve units of BUT upgrade, new CPF and BUS1 renovation, etc., which are distributed in five single buildings with a total area of about 10,000 m2, as well as equipment foundations, roads and site formation works, etc.

NEW CCR construction

NEW CCR building

Power distribution room

Construction of fire water tank

Steel binding of roof slab of LCR01 building

Civil Work Construction Project of Missan Oil Fields Natural Gas Treatment Plant in Iraq

The project design treatment capacity is 2,000,000 m3/d. It mainly includes six units of pressurization, desulfurization, sulfur recovery, heating, circulating water station and public control units, which are distributed in three single buildings with a total area of about 3,600 m2, as well as equipment foundations, cable trenches, roads and site formation works, etc.

Compressor foundation construction of booster unit

Precast pile construction

Heating unit, nitrogen generation unit, booster unit, sulfur unit

FCR12 and power distribution room

FAR13 Building